Select this option if you want to optimize unit hydrograph and loss rate parameters in this HEC-1 simulation so the calculated hydrograph will match the observed hydrograph. | |||
==Routing Optimization (OR)== | ==Routing Optimization (OR)== | ||
==Depth Area Storms (JD)== | ==Depth Area Storms (JD)== |
Revision as of 17:22, 13 February 2013
The Job Control dialog is used to define general information about the HEC-1 model. Selecting the Job Control command from the HEC-1 or OC Hydrograph menu accesses this dialog. The Job Control dialog can also be accessed by toggling on the display of Job Control cards in the Edit HEC-1 Parameters dialog and then clicking on a Job Control related card in the text display window.
Computational Time Interval
The computational time interval entered here will be used to computed the effective precipitation and unit hydrograph.
Expected Value Analysis
Toggle this checkbox on to do an expected value analysis. Effective precipitation values and losses will be automatically updated for each sub-area if they have already been computed.
HEC-1 Job Control Parameters
The Job Control dialog is used to define general information about the HEC-1 model. Selecting the Job Control command from the HEC-1 menu accesses this dialog. The Job Control dialog can also be accessed by toggling on the display of Job Control cards in the Edit HEC-1 Parameters dialog and then clicking on a Job Control related card in the text display window.
Name (ID)
Enter a name and/or project description identifying the model. Three different name records up to 78 characters each can be entered. The name records will appear at the top of the HEC-1 input file.
Beginning Time
The beginning time of the simulation is defined in this entry. The time should be specified as a single integer number defining the hours and minutes. For example 7:45 am would be entered as 745 and 1:15 PM would be 1315. Do not place a colon between the hours and minutes.
Computation Time Interval (IT)
The computational time interval defines the length in time between hydrograph ordinates. The interval should be specified in minutes, with 1 being the minimum. The total simulation time of the model will be the number of ordinates minus one times the computational time interval.
Day Month Year (IT)
The day, month, and year fields correspond to the date of the first computational time interval. The year is entered as the last two digits only.
NOTE: The date should be consistent with dates defined on IN records for precipitation and other time series data.
Number of Ordinates (IT)
The number of hydrograph ordinates computed during the simulation is defined in this entry. The length of the simulation is determined by the number of ordinates times the computational interval. If a simulation is run and a complete hydrograph is not developed, then the number of ordinates can be increased to increase the length of simulation. Similarly the number of ordinates can be decreased if the simulation continues long past the falling limb of the hydrograph.
Output Control Options (IO)
HEC-1 generates an ASCII output file that can be printed or read into any standard word processing program. The information output is controlled by the output control options in this dialog.
Listing (*LISTING)
Causes HEC-1 to echo print input data.
Tree Diagram (*DIAGRAM)
The diagram option causes a diagram of the stream network to be printed to the HEC-1 output file. This diagram should appear similar to the tree representation created by WMS.
Units (IM)
By default HEC-1 performs computations in English units, however metric unit calculations can be specified.
Basin Data Optimization (OU)
Select this option if you want to optimize unit hydrograph and loss rate parameters in this HEC-1 simulation so the calculated hydrograph will match the observed hydrograph.
Routing Optimization (OR)
Depth Area Storms (JD)
MultiFlood Storms (JR)
Related Topics
- Edit HEC-1 Parameters
- Name (ID)
- Beginning Time
- Computation Time Interval (IT)
- Day Month Year (IT)
- Number of Ordinates (IT)
- Output Control Options (IO)
- Listing
- Tree Diagram
- Units (IM)
- Basin Data Optimization (OU)
- Routing Optimization (OR)
- Depth Area Storms (JD)
- MultiFlood Storms (JR)
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |