WMS:Stochastic Modeling: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
No edit summary
Line 25: Line 25:
:7.[[WMS:Post Processing|Post Process the results]]
:7.[[WMS:Post Processing|Post Process the results]]


[[Image:image313.gif]]
:[[Image:WMSImage313.jpg|thumb|none|left|300 px]]


[[Image:image312.gif]]
:[[Image:WMSImage312.jpg|thumb|none|left|300 px]]





Revision as of 21:05, 20 February 2013

There is always a great deal of uncertainty in hydrologic and hydraulic modeling and the parameters that are used to develop solutions. Despite this, a typical flood plain boundary is black and white in that you are either in or out of the flood plain. A good engineer might be able to dispute a flood plain boundary by performing a hydrologic/hydraulic analysis with a set of equally probable parameters that results in a difference in the flood plain delineation. Until recently, computer programs lacked the ability to consider multiple probable answers and report a probabilistic floodplain boundary, but with the Stochastic Modeling tools in WMS this is possible using a combination of HEC-1 for hydrologic analysis, HEC-RAS for 1D hydraulic river modeling, and the WMS flood plain delineation tools.

You can "connect" the results of HEC-1 to a developed HEC-RAS model and then run them as many times consecutively, with the results of the HEC-1 analysis feeding the boundary conditions for an HEC-RAS model. Certain parameters (at this point only basin CN and precipitation within HEC-1, and Manning's roughness within HEC-RAS) can be varied within a range of reasonable values using Monte Carlo or Latin Hypercube simulations in order to create a number of simulations. The results of each HEC-RAS model can then be used to delineate a series of flood plains. The combination of all floodplains can then be examined in order to derive a "probabilistic" flood plain where a region flooded by 100% of the model simulation combinations can be distinguished from an area that is flooded by only 50% of the models as shown in the figure below:

The following steps outline the process for developing a stochastic model of floodplain boundaries using WMS, HEC-1, and HEC-RAS.

1.Develop a hydrologic model with HEC-1
2.Develop a working model in HEC-RAS
3.Establish appropriate flood plain delineation parameters for your area
4.Set up stochastic simulation parameters
5.Assign boundary conditions between models and run the stochastic simulation
6.Run the simulation
7.Post Process the results
WMSImage313.jpg


Related Topics

HEC-1 Modeling

HEC-RAS Modeling

Flood Plain Delineation