WMS:OC Unit Hydro Job Control: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
No edit summary |
|||
Line 13: | Line 13: | ||
{{WMSMain}} | {{WMSMain}} | ||
[[Category:Orange County Hydrology|O]] | |||
[[Category:OC Unit Hydrograph|J]] |
Revision as of 19:30, 21 February 2014
The Job Control dialog is used to define general information about the HEC-1 model. Selecting the Job Control command from the HEC-1 or OC Hydrograph menu accesses this dialog.
Computational Time Interval
The computational time interval entered here will be used to computed the effective precipitation and unit hydrograph.
Expected Value Analysis
Toggle this checkbox on to do an expected value analysis. Effective precipitation values and losses will be automatically updated for each sub-area if they have already been computed.
Related Topics
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |