WMS:GSSHA Groups Workflow: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
(Created page with "To save and run multiple projects as a GSSHA group file, do the following: {|class="mw-collapsible mw-collapsed" style="width:100%; border:1px solid #BFC9C5; margin-bottom:0.4em;" |- !style="text-align:left;"|1. Open multiple GSSHA projects. |- | :#Follow the steps to open a project in WMS for each project to be used in the GSSHA group file. :#If the projects cover the same location, some of the tables can be overwritten. :#Open the proje...")
 
No edit summary
 
Line 36: Line 36:
[[Category:General Workflows]]
[[Category:General Workflows]]
[[Category:GSSHA]]
[[Category:GSSHA]]
[[Category:GSSHA Workflows]]

Latest revision as of 14:51, 25 July 2024

To save and run multiple projects as a GSSHA group file, do the following:

1. Open multiple GSSHA projects.
  1. Follow the steps to open a project in WMS for each project to be used in the GSSHA group file.
  2. If the projects cover the same location, some of the tables can be overwritten.
  3. Open the projects in order so that the most accurate land use and soil types are imported last.
2. Save the GSSHA group project file.
  1. Select Save Group... under the GSSHA menu.
  2. Select all the projects to be saved.
3. Run the GSSHA group file in a simulation.
  1. Select GSSHA Group... under the GSSHA menu to run the files in one simulation.
  2. Put a check next to each project to be run in the group simulation.