Once all of the input necessary to run a TR-55 simulation is defined, peak flow and hydrograph computations are made using the same dialog. The first time you select the TR-55 data window lists the remaining information that must be entered before a peak flow is calculated. Once all of the items listed in this window are entered, WMS performs the calculation for peak discharge and displays the result in the same data window. Additional information (help) about any line selected in the TR-55 data window is displayed in the TR-55 help window.
The Data window display options button allows you to control which information are displayed in the data window when the peak discharge is computed. The primary purpose for including the different display options is so that all results can be copied to the clipboard and then pasted into a report document.
Related Topics
- TR55 Overview
- Name
- Drainage Area
- Curve Number
- Time of Concentration
- Channel Travel Time
- Rainfall
- Pond/Swamp Factor
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |