WMS:TR-55: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
Line 2: Line 2:
TR-55 models can be defined in WMS using the commands in the ''TR-55'' menu and resulting dialogs. The TR-55 model has long been used to determine the increase in runoff resulting from the development of rural land into urban land. The WMS interface to TR-55, combined with the basin delineation and time of concentration calculations from feature objects (see [[WMS:Lag Time and Time of Concentration|Lag Time and Time of Concentration]]), makes it simple to set up and run several different scenarios in a relatively short time period.
TR-55 models can be defined in WMS using the commands in the ''TR-55'' menu and resulting dialogs. The TR-55 model has long been used to determine the increase in runoff resulting from the development of rural land into urban land. The WMS interface to TR-55, combined with the basin delineation and time of concentration calculations from feature objects (see [[WMS:Lag Time and Time of Concentration|Lag Time and Time of Concentration]]), makes it simple to set up and run several different scenarios in a relatively short time period.


This section describes the mechanics of the WMS interface to TR-55 and is not a complete reference to the methodology, uses, and limitations. For more in depth information you should read [ftp://ftp.wcc.nrcs.usda.gov/wntsc/H&H/other/TR55documentation.pdf “Technical Release 55: Urban Hydrology for Small Watersheds, 2nd Edition.”]
This section describes the mechanics of the WMS interface to TR-55 and is not a complete reference to the methodology, uses, and limitations. For more in depth information, read [ftp://ftp.wcc.nrcs.usda.gov/wntsc/H&H/other/TR55documentation.pdf “Technical Release 55: Urban Hydrology for Small Watersheds, 2nd Edition.”]


WMS uses its own format for saving or reading a TR-55 simulation.  When you are in the Hydrologic Modeling Module, select ''TR-55'' from the drop-down list of models to make TR-55 your active model.  To edit the TR-55 parameters and run a TR-55 simulation, select the outlets or basins you wish to edit and/or run and select the '''Run Simulation''' menu item from the ''TR-55'' menu.
WMS uses its own format for saving or reading a TR-55 simulation.  When in the Hydrologic Modeling Module, select ''TR-55'' from the drop-down list of models to make TR-55 the active model.  To edit the TR-55 parameters and run a TR-55 simulation, select the outlets or basins to edit and/or run and select the '''Run Simulation''' menu item from the ''TR-55'' menu.


==Related Topics==
==Related Topics==

Revision as of 15:53, 12 September 2014

TR55EditParametersDialog.png

TR-55 models can be defined in WMS using the commands in the TR-55 menu and resulting dialogs. The TR-55 model has long been used to determine the increase in runoff resulting from the development of rural land into urban land. The WMS interface to TR-55, combined with the basin delineation and time of concentration calculations from feature objects (see Lag Time and Time of Concentration), makes it simple to set up and run several different scenarios in a relatively short time period.

This section describes the mechanics of the WMS interface to TR-55 and is not a complete reference to the methodology, uses, and limitations. For more in depth information, read “Technical Release 55: Urban Hydrology for Small Watersheds, 2nd Edition.”

WMS uses its own format for saving or reading a TR-55 simulation. When in the Hydrologic Modeling Module, select TR-55 from the drop-down list of models to make TR-55 the active model. To edit the TR-55 parameters and run a TR-55 simulation, select the outlets or basins to edit and/or run and select the Run Simulation menu item from the TR-55 menu.

Related Topics