WMS:HEC-1 Number of Ordinates (IT): Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
 
No edit summary
Line 3: Line 3:


==Related Topics==
==Related Topics==
* [[WMS:HEC-1 Job Control Parameters|Job Control Data]]
* [[WMS:HEC-1 Job Control|Job Control Data]]
* [[WMS:HEC-1 Parameters|Edit HEC-1 Parameters]]
* [[WMS:HEC-1 Parameters|Edit HEC-1 Parameters]]
* [[WMS:HEC-1 Beginning Time|Beginning Time]]
* [[WMS:HEC-1 Beginning Time|Beginning Time]]

Revision as of 18:17, 5 February 2013

The number of hydrograph ordinates computed during the simulation is defined in this entry. The length of the simulation is determined by the number of ordinates times the computational interval. If a simulation is run and a complete hydrograph is not developed, then the number of ordinates can be increased to increase the length of simulation. Similarly the number of ordinates can be decreased if the simulation continues long past the falling limb of the hydrograph.


Related Topics