WMS:HEC-1 Input Hydrograph (QI): Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
Line 15: Line 15:


[[Category:HEC-1|I]]
[[Category:HEC-1|I]]
{{stub}}

Revision as of 16:19, 22 January 2015

If a hydrograph is known for a given basin, there is no need to compute a synthetic hydrograph. This hydrograph can be input by selecting the check box and then defining the hydrograph using the XY Series Editor.

Precipitation, base flow, loss rates, and unit hydrograph methods for each hydrograph must be specified, regardless of whether or not a TIN is being used, before a complete HEC-1 file can be created. Selecting all of the basins enters data for one or more basins.

NOTE: If no basins are selected, the information entered is applied to all basins.


Related Topics