WMS:TR-20 Direct Input Hydrographs

From XMS Wiki
Revision as of 17:04, 25 February 2013 by Jcreer (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Hydrographs can be input directly, and then routed down stream, using the different routing options. To do this, select the Direct Input Hydrograph option. Hit the New button in the Define input hydrographs dialog to define a new hydrograph. The base flow and contributing drainage area for the hydrograph should be entered for computation purposes.

The hydrograph may be edited by selecting the Edit button after selecting the hydrograph to edit. For each input hydrograph in TR20, the discharge in cfs at each time interval must be entered.


Related Topics