WMS:OC Unit Hydro Job Control
From XMS Wiki
Jump to navigationJump to search
The Job Control dialog is used to define general information about the Orange County Unit Hydrograph model. The model uses the same Job Control dialog used by the HEC-1 model. Selecting the Job Control command from the HEC-1 or OC Hydrograph menu accesses this dialog. See the article HEC-1 Job Control for more information about this dialog.
For the OC hydrograph projects, note the following:
- Computational Time Interval
- The computational time interval entered here will be used to computed the effective precipitation and unit hydrograph.
- Expected Value Analysis
- Toggle this checkbox on to do an expected value analysis. Effective precipitation values and losses will be automatically updated for each sub-area if they have already been computed.
Related Topics
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |