The Job Control dialog is used to define general information about the HEC-1 model. Selecting the Job Control command from the HEC-1 or OC Hydrograph menu accesses this dialog. See the article HEC-1 Job Control for more information about this dialog.
For the OC hydrograph projects, note the following:
- Computational Time Interval
- The computational time interval entered here will be used to computed the effective precipitation and unit hydrograph.
- Expected Value Analysis
- Toggle this checkbox on to do an expected value analysis. Effective precipitation values and losses will be automatically updated for each sub-area if they have already been computed.
Related Topics
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |