WMS:HEC-1 Job Control
The Job Control dialog is used to define general information about the HEC-1 model. Selecting the Job Control command from the HEC-1 or OC Hydrograph menu accesses this dialog. The Job Control dialog can also be accessed by toggling on the display of Job Control cards in the Edit HEC-1 Parameters dialog and then clicking on a Job Control related card in the text display window.
Computational Time Interval
The computational time interval entered here will be used to computed the effective precipitation and unit hydrograph.
Expected Value Analysis
Toggle this checkbox on to do an expected value analysis. Effective precipitation values and losses will be automatically updated for each sub-area if they have already been computed.
HEC-1 Job Control Parameters
The Job Control dialog is used to define general information about the HEC-1 model. Selecting the Job Control command from the HEC-1 menu accesses this dialog. The Job Control dialog can also be accessed by toggling on the display of Job Control cards in the Edit HEC-1 Parameters dialog and then clicking on a Job Control related card in the text display window.
Related Topics
- Edit HEC-1 Parameters
- Name (ID)
- Beginning Time
- Computation Time Interval (IT)
- Day Month Year (IT)
- Number of Ordinates (IT)
- Output Control Options (IO)
- Listing
- Tree Diagram
- Units (IM)
- Basin Data Optimization (OU)
- Routing Optimization (OR)
- Depth Area Storms (JD)
- MultiFlood Storms (JR)
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |