WMS:MODRAT Job Control Parameters
From XMS Wiki
Jump to navigationJump to search
The Job Control dialog of MODRAT is used to set several options which affect the duration MODRAT will model and the data it will use for input. This dialog is pictured below.
Frequency
The frequency chosen in the Job Control dialog does not affect the MODRAT computations. It is, however, included for reference in output from MODRAT.
Related Topics
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |