WMS:TR-20 Reach Length
From XMS Wiki
Jump to navigationJump to search
This value should be the length, in feet, along the river reach for which routing takes place. If a TIN, DEM, or Map-based watershed model is present this value is automatically computed and assigned to this field whenever the Compute Basin Data command is executed. A cross section must be assigned to the reach length assigned.
Related Topics
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |