WMS:Hydraulic Modeling: Difference between revisions
No edit summary |
No edit summary |
||
Line 7: | Line 7: | ||
#Create the [[WMS:1D-HYD Cross-section Coverage Type|cross section arcs]] at important/required locations along the section of river being modeled. | #Create the [[WMS:1D-HYD Cross-section Coverage Type|cross section arcs]] at important/required locations along the section of river being modeled. | ||
#An [[WMS:Area Property Coverage|Area Property coverage]] can be used to map roughness values to line properties on the cross sections | #An [[WMS:Area Property Coverage|Area Property coverage]] can be used to map roughness values to line properties on the cross sections | ||
#[[WMS:Extract Cross | #[[WMS:Extract Cross Sections|Extract cross sections]] from the TIN and establish the 1D Model | ||
#[[WMS:Export GIS File|Export the GIS data]] and finish defining HEC-RAS (or other model). | #[[WMS:Export GIS File|Export the GIS data]] and finish defining HEC-RAS (or other model). | ||
Line 20: | Line 20: | ||
* [[WMS:Area Property Coverage|Area Property Coverage]] | * [[WMS:Area Property Coverage|Area Property Coverage]] | ||
* [[WMS:Editing Cross Sections|Editing Cross Sections]] | * [[WMS:Editing Cross Sections|Editing Cross Sections]] | ||
* [[WMS:Extract Cross | * [[WMS:Extract Cross Sections|Extracting Cross Sections]] | ||
* [[WMS:Mapping the Conceptual Model to a River Schematic|Mapping Conceptual Models to River Schematics]] | * [[WMS:Mapping the Conceptual Model to a River Schematic|Mapping Conceptual Models to River Schematics]] | ||
* [[WMS:Recompute All Stations|Recompute All Stations]] | * [[WMS:Recompute All Stations|Recompute All Stations]] |
Revision as of 17:51, 21 February 2013
The primary purpose of the hydraulic modeling interface within WMS is to process digital terrain and map data (TINs and coverages) to build the basic geometry necessary for a 1D Hydraulic Model. Much of the information for developing models with these tools is described in the information on River Tools in the Map module.
The general process for developing a model consists of the following steps:
- Prepare a background digital terrain model that represents the river channel bathymetry and surrounding flood plain with enough detail to substantiate the modeling objectives.
- Develop a 1D-Hydraulic Centerline coverage including the centerline and bank arcs.
- Create the cross section arcs at important/required locations along the section of river being modeled.
- An Area Property coverage can be used to map roughness values to line properties on the cross sections
- Extract cross sections from the TIN and establish the 1D Model
- Export the GIS data and finish defining HEC-RAS (or other model).
It is possible to establish the hydraulic model with extracting cross section information from a TIN. Cross sections which have already been surveyed can be used by assigning them to an arc. This, along with geo-referencing the data is done using the cross section editor from the River Tools menu in the Map module (when River Tools is the active model).
Related Topics
- River Tools
- Using TINs
- 1D-Hydraulic Centerline Coverage
- Cross Section Coverage
- Area Property Coverage
- Editing Cross Sections
- Extracting Cross Sections
- Mapping Conceptual Models to River Schematics
- Recompute All Stations
- Exporting the GIS File
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |