WMS:DEM Delineation Workflow: Difference between revisions
From XMS Wiki
Jump to navigationJump to search
(Created page with "To delineate a DEM in WMS, use the following steps: {{DEM Delination Workflow}} {{WMSMain}} Category:WMS Workflows Category:General Workflows Category:DEM") |
No edit summary |
||
Line 1: | Line 1: | ||
To delineate a DEM in WMS, use the following steps: | To delineate a DEM in WMS, use the following steps: | ||
{{DEM | {{DEM Delineation Workflow}} | ||
Revision as of 15:33, 10 December 2019
To delineate a DEM in WMS, use the following steps:
1. Start the Hydrologic Modeling Wizard and setup the project. |
---|
|
2. Compute flow directions and accumulations. |
---|
|
3. Choose outlet location. |
---|
|
4. Delineate watershed. |
---|
|
5. Create sub-basins. (optional) |
---|
|
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |