WMS:Converting TIN Vertices/Nodes to Outlets
From XMS Wiki
Jump to navigationJump to search
The Node ↔ Outlets command will add all selected vertices as outlet points if they are not already outlet points.
The Node ↔ Outlets command will remove selected outlet points if they are already defined as outlets. Outlet points are selected using the Select Vertices tool. When an outlet is deleted, the area or triangles associated with that outlet's drainage basins are reassigned to the next downstream basin.
Related Topics:
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |