WMS:TR-20 Job Control Parameters

From XMS Wiki
Revision as of 15:48, 12 September 2014 by Jcreer (talk | contribs) (→‎Base Flow)
Jump to navigationJump to search

The Job Control parameters include all of the data necessary to run a TR-20 analysis that are not a part of a basin, reach, or reservoir. The following are the specific parameters defined as part of job control:

Precipitation

In TR20, there are two different ways to define precipitation. Precipitation is defined by selecting the Job Control command from the TR20 menu. Then, select the Define Precipitation button to define precipitation over the entire watershed. You can define precipitation by using either a standard SCS rainfall distribution or by defining a custom rainfall distribution. If a custom rainfall distribution is used, you must define a custom rainfall distribution in the XY Series Editor. If one of the standard SCS rainfall distributions are used, you can select one of the following rainfall types:

  • Emergency Spillway and Freeboard
  • Type I: 24 hours
  • Type II: 24 hours
  • Type IA: 24 hours
  • Type III: 24 hours
  • Type II: 48 hours

For all the standard distributions, you must define the rainfall depth. For the dimensionless distribution, you must also define the rainfall duration. You only need to define the depth and/or duration of the rainfall for a custom distribution if one of the units entered in the XY Series Editor is dimensionless.

Time Control

Main Time Increment

The computational time increment defines the length in time between hydrograph ordinates. The interval should be specified in hours.

Starting Time

The starting time of the simulation is defined in this entry. The time should be specified as floating point number of hours past midnight. For example 7:45 am would be entered as 7.75 and 1:20 p.m. as 13.33.

Title

Enter a name and/or project description identifying the model. Two different title records up to 72 characters each can be entered. The title records will appear at the top of the TR20 input file.

Unit Hydrograph Definition

TR20 offers two ways of defining the unit hydrograph used to compute runoff from the watershed. The first way is to use the standard SCS hydrograph provided with TR20. Another way is to define an input hydrograph. This can be done by selecting the Define another dimensionless unit hydrograph radio button and defining the unit hydrograph in the time series editor.

Base Flow

Base flow can be entered in TR20 from the Job Control dialog by selecting the Define Base Flow button. There are two ways for defining base flow in TR20. One way is to define a constant base flow. The second way is to define a triangular base flow in the watershed by specifying a volume in inches, a peak time in hours, and a base time in hours. By selecting the appropriate option, a user can define either a triangular or a constant base flow for the watershed.

Related Topics