WMS:TR-20 Time Control
From XMS Wiki
Jump to navigationJump to search
Main Time Increment
The computational time increment defines the length in time between hydrograph ordinates. The interval should be specified in hours.
Starting Time
The starting time of the simulation is defined in this entry. The time should be specified as floating point number of hours past midnight. For example 7:45 am would be entered as 7.75 and 1:20 p.m. as 13.33.
Related Topics
WMS – Watershed Modeling System | ||
---|---|---|
Modules: | Terrain Data • Drainage • Map • Hydrologic Modeling • River • GIS • 2D Grid • 2D Scatter | |
Models: | CE-QUAL-W2 • GSSHA • HEC-1 • HEC-HMS • HEC-RAS • HSPF • MODRAT • NSS • OC Hydrograph • OC Rational • Rational • River Tools • Storm Drain • SMPDBK • SWMM • TR-20 • TR-55 | |
Toolbars: | Modules • Macros • Units • Digitize • Static Tools • Dynamic Tools • Drawing • Get Data Tools | |
Aquaveo |