WMS:TR-20 Time Control

From XMS Wiki
Revision as of 19:32, 26 June 2008 by Eshaw (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Main Time Increment

The computational time increment defines the length in time between hydrograph ordinates. The interval should be specified in hours.

Starting Time

The starting time of the simulation is defined in this entry. The time should be specified as floating point number of hours past midnight. For example 7:45 am would be entered as 7.75 and 1:20 p.m. as 13.33.


Related Topics