When the '''Create Streams''' command is chosen, a stream  network for the current selected string of TIN vertices is created. The vertex  string is made by connecting points which are known to lie in a stream, street,  or other drainage structure. If the entered vertex string crosses triangle  edges, the user will be asked if he wishes to insert a [[WMS:TIN Breaklines|breakline]]. The  breakline is inserted by creating new points where the line crosses a triangle  edge. The elevation of the new points is determined by linear interpolation  along the edge. Inserting the breakline in this fashion alters the topology  without affecting the geometry.
When the '''Create Streams''' command (in the [[WMS:Drainage_Module_Menus#Drainage_TIN_Menu|''TIN'']] menu for the Drainage module) is chosen, a stream  network for the current selected string of TIN vertices is created. The vertex  string is made by connecting points which are known to lie in a stream, street,  or other drainage structure. If the entered vertex string crosses triangle  edges, a prompt will ask if wanting to insert a [[WMS:TIN Breaklines|breakline]]. The  breakline is inserted by creating new points where the line crosses a triangle  edge. The elevation of the new points is determined by linear interpolation  along the edge. Inserting the breakline in this fashion alters the topology  without affecting the geometry.


Since flow through a stream network is defined strictly by the “linked” set  of vertices, a downstream vertex does not even have to be lower than the  upstream vertex. However, care should be taken to ensure that the general  direction of the stream is downhill. The intent of creating streams in this  fashion is to eliminate the need of defining a continuous set of channel edges  with the TIN editing techniques described above. This type of stream creation is  particularly important when doing basin delineation for urban areas.
Since flow through a stream network is defined strictly by the “linked” set  of vertices, a downstream vertex does not even have to be lower than the  upstream vertex. However, care should be taken to ensure that the general  direction of the stream is downhill. The intent of creating streams in this  fashion is to eliminate the need of defining a continuous set of channel edges  with the TIN editing techniques described above. This type of stream creation is  particularly important when doing basin delineation for urban areas.
Line 10: Line 10:
==Deleting Stream Segments==
==Deleting Stream Segments==


The '''Delete Stream Segments''' command deletes the segment of the stream between two selected stream nodes. An outlet point is inserted at the upstream node. If a single stream node is selected this command deletes the portion of the stream network from the selected stream node upward, including the selected stream node.
The '''Delete Stream Segments''' command (in the [[WMS:Drainage_Module_Menus#Drainage_TIN_Menu|''TIN'']] menu for the Drainage module) deletes the segment of the stream between two selected stream nodes. An outlet point is inserted at the upstream node. If a single stream node is selected this command deletes the portion of the stream network from the selected stream node upward, including the selected stream node.


==Create Pipe==
==Create Pipe==


When the '''Create Pipe''' command is chosen, a pipe connecting stream nodes in the current selected string of TIN vertices is created. A pipe can be used to create a "stream" from any stream node to another without enforcing a continuous set of triangle edges between the two stream nodes. Pipes differ from streams in that when a flow path intersects a stream it then continues down the stream from node to node, whereas when a flow path intersects a pipe it continues overland across the pipe.
When the '''Create Pipe''' command (in the [[WMS:Drainage_Module_Menus#Drainage_TIN_Menu|''TIN'']] menu for the Drainage module) is chosen, a pipe connecting stream nodes in the current selected string of TIN vertices is created. A pipe can be used to create a "stream" from any stream node to another without enforcing a continuous set of triangle edges between the two stream nodes. Pipes differ from streams in that when a flow path intersects a stream it then continues down the stream from node to node, whereas when a flow path intersects a pipe it continues overland across the pipe.


==Displaying the Stream Profile==
==Displaying the Stream Profile==


The '''Display Stream Profile''' command is used to display the elevation profile between two selected stream nodes. Because of the limited resolution of most elevation data sets, it is difficult to get a continuous set of stream bed elevations. Within this dialog you can select and edit the elevation of individual stream nodes or you can select two different stream nodes from the profile plot and linearly interpolate the elevation of all nodes in between. In this way you can smooth out pits in the stream that may exist only because of a lack of resolution.
The '''Display Stream Profile''' command (in the [[WMS:Drainage_Module_Menus#Drainage_TIN_Menu|''TIN'']] menu for the Drainage module) is used to display the elevation profile between two selected stream nodes. Because of the limited resolution of most elevation datasets, it is difficult to get a continuous set of stream bed elevations. Within this dialog, select and edit the elevation of individual stream nodes or can select two different stream nodes from the profile plot and linearly interpolate the elevation of all nodes in between. In this way it is possible to smooth out pits in the stream that may exist only because of a lack of resolution.
 
When using this command you [[WMS:Dynamic Tool Palette|must select at least two stream nodes]] and the second one selected must be upstream of the first.  


When using this command, It's necessary to [[WMS:Dynamic Tool Palette|select at least two stream nodes]] and the second one selected must be upstream of the first.


==Related Topics==
==Related Topics==
Line 27: Line 26:
* [[WMS:TIN Basins|Defining Basins]]
* [[WMS:TIN Basins|Defining Basins]]
* [[WMS:Reservoirs|Reservoirs]]
* [[WMS:Reservoirs|Reservoirs]]
* [[WMS:Drainage Module Menus|Drainage Module Menus]]





Latest revision as of 21:56, 30 December 2019

Streams can be defined for a TIN by manually connecting, or linking, consecutive channel edges together. They appear similar to stream feature arcs, but are not. On a TIN the streams are defined simply as connected vertices.

Because TINs are created from a sparse set of points, it is often difficult to explicitly define channel edges, particularly in urban areas where well defined channels may not even exist. For this reason, a stream can be created by manually selecting a set of vertices which defines a channel. This method also allows a street or storm drain to be incorporated into the TIN and used as part of the "stream network."

Create Streams

When the Create Streams command (in the TIN menu for the Drainage module) is chosen, a stream network for the current selected string of TIN vertices is created. The vertex string is made by connecting points which are known to lie in a stream, street, or other drainage structure. If the entered vertex string crosses triangle edges, a prompt will ask if wanting to insert a breakline. The breakline is inserted by creating new points where the line crosses a triangle edge. The elevation of the new points is determined by linear interpolation along the edge. Inserting the breakline in this fashion alters the topology without affecting the geometry.

Since flow through a stream network is defined strictly by the “linked” set of vertices, a downstream vertex does not even have to be lower than the upstream vertex. However, care should be taken to ensure that the general direction of the stream is downhill. The intent of creating streams in this fashion is to eliminate the need of defining a continuous set of channel edges with the TIN editing techniques described above. This type of stream creation is particularly important when doing basin delineation for urban areas.

Deleting Stream Segments

The Delete Stream Segments command (in the TIN menu for the Drainage module) deletes the segment of the stream between two selected stream nodes. An outlet point is inserted at the upstream node. If a single stream node is selected this command deletes the portion of the stream network from the selected stream node upward, including the selected stream node.

Create Pipe

When the Create Pipe command (in the TIN menu for the Drainage module) is chosen, a pipe connecting stream nodes in the current selected string of TIN vertices is created. A pipe can be used to create a "stream" from any stream node to another without enforcing a continuous set of triangle edges between the two stream nodes. Pipes differ from streams in that when a flow path intersects a stream it then continues down the stream from node to node, whereas when a flow path intersects a pipe it continues overland across the pipe.

Displaying the Stream Profile

The Display Stream Profile command (in the TIN menu for the Drainage module) is used to display the elevation profile between two selected stream nodes. Because of the limited resolution of most elevation datasets, it is difficult to get a continuous set of stream bed elevations. Within this dialog, select and edit the elevation of individual stream nodes or can select two different stream nodes from the profile plot and linearly interpolate the elevation of all nodes in between. In this way it is possible to smooth out pits in the stream that may exist only because of a lack of resolution.

When using this command, It's necessary to select at least two stream nodes and the second one selected must be upstream of the first.