GMS:Zone Budget

From XMS Wiki
Revision as of 15:13, 30 October 2019 by Astone (talk | contribs) (→‎Defining Zones: fixing the ids to IDs)
Jump to navigationJump to search
MODFLOW
Pre-processing
MODFLOW Commands
Building a MODFLOW Model
Map to MODFLOW
Calibration
Packages Supported in GMS
Saving a MODFLOW Simulation
Importing MODFLOW Files
Unsupported MODFLOW Features
Run MODFLOW
Post-processing
MODFLOW Display Options
MODFLOW Post-Processing Viewing Options
Reading a MODFLOW Simulation
Tutorials
Packages
Flow: BCF6, HUF, LPF, UPW
Solvers:

DE4, GMG, NWT, PCG,

PCGN, LMG, SIP, SOR,

SMS
Other:

BAS6, BFH, CHD1, CLN,

DRN1, DRT1, EVT1, ETS1,

GAGE, GHB1, GNC, HFB1,

HUF, LAK3, MNW1, MNW2,

OUT1, RCH1, RIV1, SFR2,

STR1, SUB1, SWI2, WEL1,

UZF1

In previous versions of GMS, it has been possible to view a detailed MODFLOW flow budget for a set of selected cells using the Flow Budget command in the Data menu. Now, the flow budget can be summarized based on user-defined zones. This provides a capability quite similar to the USGS ZoneBudget tool. However, the calculations are all done inside GMS using the CCF (Cell-to-Cell Flow) file generated by MODFLOW.

The Zone Budget Utility is included with all paid editions of GMS.

Defining Zones

The first step in using this utility is to identify the model zones by assigning a zone budget ID to each of the cells in the grid. The zone budget ID is an integer value. It can be associated with polygons in a MODFLOW conceptual model in the map module. The zone budget id property is listed in the Areal Properties column of the Coverage Setup dialog. These IDs are then assigned to the appropriate grid cells when the Map→MODFLOW command is selected. The IDs can also be assigned directly to cells by selecting a set of cells and selecting the Cell Properties command in the MODFLOW menu.

A Zone Budget IDs item is also included just below the MODFLOW icon in the Project Explorer window. Clicking on this icon displays the zone budget IDs and double-clicking brings up the zone budget ID array in the spreadsheet editor.

Viewing the Flow Budget

Once the zone budget IDs have been assigned, the flow budget for each zone can be viewed by selecting the Flow Budget command in the MODFLOW menu. This brings up the Flow Budget dialog. There is a new zone selector combo box at the top of the dialog. The flow budget associated with the selected zone is shown in the table. The combo box includes an "All zones" option that displays a summary for all zones in the model. Also, turning on the Use all time steps toggle will create a flow budget report for each time step in the current MODFLOW solution. The flow in flow budget is displayed as positive when flow is from the upper face to the lower face, left face to right face, and back to front.

Flow Budget dialog showing the Zones tab.

Viewing in a Plot File

For a transient model a user may use the flow budget vs. time plot to view the flow budget for any number of cells.

Flow plot.jpg

By right-clicking on the plot and select the view values option, GMS will generate a table of the flow budget for the different time steps.

View Values dialog

Viewing the MODFLOW CCF File

There are two new options to view MODFLOW cell-to-cell flow (CCF) file output:

  1. The CCF file can be viewed in a spreadsheet by right-clicking on the CCF file CCF Dataset Active.svg in the Project Explorer and selecting the View Values command.
  2. The CCF file can also be converted to a set of datasets. One dataset would be created for drains (if they exist), one for rivers etc., and three for cell-to-cell flow (flow right, flow back, flow down).
CCF datasets displayed in the Project Explorer