There are two key parts to running a long-term simulation: setting up the precipitation file to cover multiple events, and setting up the evapotranspiration model with its hydrometeorological (or “hmet”) data. To create a long-term simulation with GSSHA, do the following:
1. Update the Job Control parameters. |
---|
|
2. Set up the evapotranspiration model. |
---|
|
3. Run the long-term simulation. |
---|
|