WMS:Define Flood Inundation Polygon

From XMS Wiki
Revision as of 22:44, 9 February 2011 by Cmsmemoe (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search

Overview

HY8ModelingWizardDefineFloodPolygon.png

The Define Flood Inundation Polygon step is used to define a flood inundation polygon if a drainage coverage with a polygon defining the inundation area does not already exist. You need to define a flood inundation polygon for any culvert crossings with no outlets (and no basin polygons) assigned but with a hydrograph. The purpose of this inundation polygon is to compute a storage capacity curve and to define a flood barrier when running the floodplain delineation.

Help

Selecting the define flood inundation polygon button allows you to create arcs that represent your flood inundation boundary. Normally, you should use the roadway as one of the arcs and build arcs for the rest of the inundation boundary. If you select delete flood inundation polygon and then click on an arc or inside that polygon, the polygon is deleted and all the generic arcs (not the roadway centerline arcs) making up that polygon are deleted from memory. Selecting build polygons builds all the polygons in the HY-8 coverage and assigns them as flood inundation polygons without prompting whether you want to use all the arcs to build polygons.