WMS:Delineate Watershed: Difference between revisions

From XMS Wiki
Jump to navigationJump to search
No edit summary
Line 11: Line 11:
'''Create Tc Coverage''' – If this toggle is selected, a Time Computation coverage containing an arc with the longest flow path is created after delineating the watershed and sub-basins.
'''Create Tc Coverage''' – If this toggle is selected, a Time Computation coverage containing an arc with the longest flow path is created after delineating the watershed and sub-basins.


'''Units''' – This button is used to define the model and computation coordinates and units.  A user can turn on the option to create a Tc coverage and change which data is computed by selecting the ''Drain Data Compute Opts...'' button in the Units dialog.
'''Units''' – This button is used to define the model and computation coordinates and units.  Turn on the option to create a Tc coverage and change which data is computed by selecting the ''Drain Data Compute Opts...'' button in the ''Units'' dialog.


'''Sub-divide Watershed''' – This button subdivides the watershed into sub-basins based on the maximum sub-basin area entered.
'''Sub-divide Watershed''' – This button subdivides the watershed into sub-basins based on the maximum sub-basin area entered.

Revision as of 15:39, 23 February 2016

HY8 Modeling Wizard showing the Delineate Watershed step

The Delineate Watershed step is used to delineate a watershed.

Help

Stream threshold value – This value is used to modify the stream density. Lower values will cause the streams to be more dense while higher values will create fewer streams in the completed model.

Apply to Display – Select this button to apply the stream threshold value entered to the display.

Create Tc Coverage – If this toggle is selected, a Time Computation coverage containing an arc with the longest flow path is created after delineating the watershed and sub-basins.

Units – This button is used to define the model and computation coordinates and units. Turn on the option to create a Tc coverage and change which data is computed by selecting the Drain Data Compute Opts... button in the Units dialog.

Sub-divide Watershed – This button subdivides the watershed into sub-basins based on the maximum sub-basin area entered.

Delineate Watershed – This button delineates the watershed and computes each sub-basin's data based on the selected watershed delineation parameters.

After delineating a watershed, it is possible to manually edit the extents of the watershed.